The sidewalk on the western side of the Ballard Bridge is closed for up to three weeks for painting of the pedestrian railing. The sidewalk will be open on the weekends.
The stairway to the western sidewalk at the north end of the bridge is closed as well.
The sidewalk on the eastern side of the bridge remains open.